
10:00 AM PST | 01:00 PM EST
Overview:
This practical webinar provides an end-to-end guide to construction project exit management, from planning closeout requirements early in the project through substantial completion, punch-list control, commissioning, final documentation, owner handover, financial closeout, and demobilization.
Attendees will learn how to build a closeout plan, assign responsibilities, track outstanding items, coordinate as-built drawings and operation and maintenance documentation, manage warranties and owner training, support final inspections, and maintain a clear record of completion. The session will also cover common closeout failure points and practical methods for improving accountability and visibility.
The goal is to help construction professionals treat closeout as a managed project phase rather than an administrative afterthought, while recognizing that contractual, legal, payment, and regulatory requirements must always be checked against the specific project documents and applicable rules.
Why you should Attend:
A project can be physically close to finished and still be far from administratively complete. Without a clear closeout and exit plan, teams risk delayed final payment, incomplete owner records, open punch items, missing warranties, poorly coordinated demobilization, and disputes over what remains outstanding.
This session provides a practical framework for managing the final phase of a project from substantial completion through handover, final completion, demobilization, and warranty transition. Attendees will leave with a clearer understanding of what needs to be tracked, who needs to own it, and how to prevent closeout from becoming a last-minute scramble.
Areas Covered in the Session:
Speaker Profile